|
21
Pt Cleaning &
Maintenance
|
|
A
Cleaning & Preventative Maintenance Program should be designed
to regulate the frequency of calls and to allow control of the
costs associated with breakdowns. Our preventative maintenance
program will extend the life of your printer, minimize inconvenient
breakdowns and improve the print quality of your machine. As well
each of your printers will be recorded in our "Asset Tracking
Database" (ATdb). This database can reveal some valuable
information to better allow the management of your assets.
|
|
The
Program's Checklist includes;
|
| The removal, cleaning
& inspection of; |
17 |
Fuser lower pressure roller
(silicon treated) |
| 1 |
Fuser roller assembly, |
18 |
Fuser upper fuser roller (silicon
treated) |
| 2 |
High voltage power supply, |
Finishing touches; |
| 3 |
AC power supply |
19 |
Replace ozone filter (select
models) |
| 4 |
DC power supply |
20 |
Final vacuum & assembly |
| 5 |
Transfer guide assembly |
21 |
Clean exterior & run performance
test, |
| 6 |
Pickup roller assembly |
Image formation troubleshooting; |
| Followed by the inspection
and cleaning of; |
1 |
Image development check |
| 7 |
The delivery assembly |
2 |
Drum rotation check |
| 8 |
The erase lamp |
3 |
Beam to drum image check |
| 9 |
The laser or LED assembly |
4 |
Primary corona functional check |
| 10 |
The transfer corona assembly |
5 |
AC/DC bias check |
| 11 |
The lower cooling fan |
6 |
Transfer corona functional check |
| Cleaning, inspection and
alignment of; |
7 |
Erase lamp check |
| 12 |
Fibre optic cable |
8 |
Image quality check |
| 13 |
The beam to drum mirror |
9 |
Paper curl |
| Cleaning, inspection and
lubrication of; |
10 |
Density check |
| 14 |
The upper cooling fan |
11 |
Registration check |
| 15 |
Fuser gears |
12 |
Skew tolerance |
| 16 |
Fuser separation claws |
13 |
Fusing check |
| |