|
21 Pt Cleaning & Maintenance
A Cleaning & Preventative Maintenance Program should be designed to regulate the frequency of calls and to allow control of the costs associated with breakdowns. Our preventative maintenance program will extend the life of your printer, minimize inconvenient breakdowns and improve the print quality of your machine. As well each of your printers will be recorded in our "Asset Tracking Database" (ATdb). This database can reveal some valuable information to better allow the management of your assets.
The Program's Checklist includes;
|
The cleaning & inspection of;
-
Fuser roller assembly,
-
High voltage power supply,
-
AC power supply
-
DC power supply
-
Transfer guide assembly
-
Pickup roller assembly
-
The delivery assembly
-
The erase lamp
-
The laser or LED assembly
-
The transfer corona assembly
-
The lower cooling fan
Cleaning, inspection & alignment of;
-
Fibre optic cable
-
The beam to drum mirror
Cleaning, inspection & lubrication of;
-
The upper cooling fan
-
Fuser gears
-
Fuser separation claws
-
Fuser lower pressure roller (silicon treated).
-
Fuser upper fuser roller (silicon treated)
-
Replace ozone filter (select models)
-
Final vacuum & assembly
-
Clean exterior & run performance test,
|
Extras
Image formation troubleshooting;
-
Image development check
-
Drum rotation check
-
Beam to drum image check
-
Primary corona functional check
-
AC/DC bias check
-
Transfer corona functional check
-
Erase lamp check
-
Image quality check
-
Paper curl
-
Density check
-
Registration check
-
Skew tolerance
-
Fusing check
|
|